Gut Rehab Construction
8.9 • General contractor
Gut rehab construction involves complete transformation from disrepair to modern finishes with smart updates throughout. The process shows professionalism and care from demolition to final inspection, resulting in cozy, updated spaces.
View menu
Good to know
1
Initial consultations are free, allowing clients to discuss their vision without commitment.
2
The renovation process typically takes 3-6 months, depending on the scope of work.
3
A detailed estimate is provided before any work begins, ensuring transparency in costs.
608 N La Salle Dr #305, Chicago, Illinois, United States
Similar places nearby
A few nearby places worth checking next.
Moderne Living
Beautifully designed showroom featuring customizable closet systems with sleek Italian craftsmanship and luxurious finishes.
Solve Clinics Med Spa Chicago (River North)
Stunning, modern med spa with a calming, luxurious ambiance, featuring spotless, thoughtfully designed interiors.
Lume
Impeccably clean, modern wellness spa with a calming, zen atmosphere and thoughtfully designed healing spaces.