Solar SME, INC.
8.7 • Solar energy company
Solar energy company operates with subcontracted installers who lack expertise, leading to installation delays and inspection failures. The process from quote to operation spans over six months, involving multiple visits and permit hurdles. Panels appear sleek and low profile, with a user-friendly app eventually providing system data.
View menu
Good to know
1
The entire process takes around 2.5 months from quote to permission to operate.
2
Expect delays in the permitting process and parts delivery.
3
The installation led to daily power outages that damaged my irrigation system.
2630 Aero Dr, Grand Prairie, Texas, United States
Similar places nearby
A few nearby places worth checking next.
Vivid Flowers
Reliable florist offering customizable, beautifully arranged bouquets with fast, punctual delivery matching online descriptions.
Tuff Shed Grand Prairie
Sturdy 10x12 prefab shed with insulated, painted finish, customizable design, and a ten-year warranty.
GoECM
Reliable supplier offering top-quality OEM parts with fast, local delivery and precise vehicle-specific calibration.